Moray East Document Library

Our document library page contains environmental statements, reports, applications, and general information about the project. This material is for the general public.


Thumbnail
folder icon
Volume 5
folder icon
Volume 6a
folder icon
Volume 6b
folder icon
Volume 7
folder icon
Volume 8-11
folder icon
Volume 1
folder icon
Volume 2
folder icon
Volume 3
folder icon
Volume 4
PDF file icon
ES Book Map and Guide

Moray East Key Facts

  • Consent for construction of up to 1,116MW granted in 2016
  • CfD for 950MW awarded in 2017
  • Connection to National Grid at a new substation to be constructed at New Deer in Aberdeenshire via underground cable (planning permission granted by Aberdeenshire Council in 2014)
  • Total underground export cable corridor route 86km (52km offshore and 34km onshore)
  • Total wind farm Area – 295km2
  • Maximum turbine blade-tip height – 204m (669 feet)
  • Minimum distance from shore – 22km (13.5 miles).