Moray East Document Library

Our document library page contains environmental statements, reports, applications, and general information about the project. This material is for the general public.


Thumbnail
PDF file icon
0 SLVIA Figure contents
PDF file icon
Section 1 SLVIA Baseline Figures
PDF file icon
Section 3 SLVIA OnTI Figures
PDF file icon
Section 4 SLVIA CIA Figures

Moray East Key Facts

  • Consent for construction of up to 1,116MW granted in 2016
  • CfD for 950MW awarded in 2017
  • Connection to National Grid at a new substation to be constructed at New Deer in Aberdeenshire via underground cable (planning permission granted by Aberdeenshire Council in 2014)
  • Total underground export cable corridor route 86km (52km offshore and 34km onshore)
  • Total wind farm Area – 295km2
  • Maximum turbine blade-tip height – 204m (669 feet)
  • Minimum distance from shore – 22km (13.5 miles).