Moray East Document Library

Our document library page contains environmental statements, reports, applications, and general information about the project. This material is for the general public.


Thumbnail
PDF file icon
4 5 Ornithology Vol 6b A3
PDF file icon
4 6 Intertidal Ecology Vol 6b
PDF file icon
4 7 Terrestrial Ecology Vol 6b
PDF file icon
5 1 Commercial Fisheries Vol 6b
PDF file icon
5 2 and 8 2 Shipping and Navigation Vol 6b
PDF file icon
5 5 Archaeology Vol 6b
PDF file icon
5 6 Socioeconomic Recreation and Tourism Vol 6b
PDF file icon
5 7 Traffic and Transport Vol 6b
PDF file icon
5 8 Other Human Activities Vol 6b

Moray East Key Facts

  • Consent for construction of up to 1,116MW granted in 2016
  • CfD for 950MW awarded in 2017
  • Connection to National Grid at a new substation to be constructed at New Deer in Aberdeenshire via underground cable (planning permission granted by Aberdeenshire Council in 2014)
  • Total underground export cable corridor route 86km (52km offshore and 34km onshore)
  • Total wind farm Area – 295km2
  • Maximum turbine blade-tip height – 204m (669 feet)
  • Minimum distance from shore – 22km (13.5 miles).