Moray East Document Library

Our document library page contains environmental statements, reports, applications, and general information about the project. This material is for the general public.


Thumbnail
PDF file icon
Eastern Area Scoping Report
PDF file icon
Moray West Offshore Transmission Infrastructure Scoping Report
PDF file icon
Moray West Onshore Transmission Infrastructure Scoping Report
PDF file icon
MORL WDA Scoping Report May 2016 16MB
PDF file icon
Non Technical Summary As Published
PDF file icon
Transmission Infrastructure Scoping Report 2014

Moray East Key Facts

  • Consent for construction of up to 1,116MW granted in 2016
  • CfD for 950MW awarded in 2017
  • Connection to National Grid at a new substation to be constructed at New Deer in Aberdeenshire via underground cable (planning permission granted by Aberdeenshire Council in 2014)
  • Total underground export cable corridor route 86km (52km offshore and 34km onshore)
  • Total wind farm Area – 295km2
  • Maximum turbine blade-tip height – 204m (669 feet)
  • Minimum distance from shore – 22km (13.5 miles).