Moray East Document Library

Our document library page contains environmental statements, reports, applications, and general information about the project. This material is for the general public.


Thumbnail
PDF file icon
Appendix 4 2 A Benthic Ecology Wind Farm Sites
PDF file icon
Appendix 4 4 A Marine Mammals Baseline
PDF file icon
Appendix 4 5 A Ornithology
PDF file icon
Appendix 4 5 B Aerial Ornithology Surveys
PDF file icon
Appendix 4 5 C Seabird Tracking Modelling
PDF file icon
Appendix 4 6 A Intertidal Ecology
PDF file icon
Appendix 4 7 A Terrestrial Ecology
PDF file icon
Appendix 5 1 A Commercial Fisheries
PDF file icon
Appendix 5 2 A Hazard Log
PDF file icon
Appendix 5 2 B Consequences Assessment

Moray East Key Facts

  • Consent for construction of up to 1,116MW granted in 2016
  • CfD for 950MW awarded in 2017
  • Connection to National Grid at a new substation to be constructed at New Deer in Aberdeenshire via underground cable (planning permission granted by Aberdeenshire Council in 2014)
  • Total underground export cable corridor route 86km (52km offshore and 34km onshore)
  • Total wind farm Area – 295km2
  • Maximum turbine blade-tip height – 204m (669 feet)
  • Minimum distance from shore – 22km (13.5 miles).