Moray East Document Library

Our document library page contains environmental statements, reports, applications, and general information about the project. This material is for the general public.


Thumbnail
PDF file icon
Appendix 1 2 A Relevant Legislation
PDF file icon
Appendix 1 3 A Draft EMP
PDF file icon
Appendix 1 3 B Scoping Opinion OGS and TI
PDF file icon
Appendix 1 3 C Draft ES Consultation Response
PDF file icon
Appendix 1 3 D MFOWDG Cumulative Assessment
PDF file icon
Appendix 1 3 E Preliminary Decommissioning Programme
PDF file icon
Appendix 1 4 A Grouped Stakeholder List
PDF file icon
Appendix 1 4 B Stakeholder Engagement Strategy
PDF file icon
Appendix 1 4 C Stakeholder Meetings
PDF file icon
Appendix 1 4 D Results of Opinion Survey

Moray East Key Facts

  • Consent for construction of up to 1,116MW granted in 2016
  • CfD for 950MW awarded in 2017
  • Connection to National Grid at a new substation to be constructed at New Deer in Aberdeenshire via underground cable (planning permission granted by Aberdeenshire Council in 2014)
  • Total underground export cable corridor route 86km (52km offshore and 34km onshore)
  • Total wind farm Area – 295km2
  • Maximum turbine blade-tip height – 204m (669 feet)
  • Minimum distance from shore – 22km (13.5 miles).